2014 Vibracoring Projects

January – June 2014
Alfa 1 Technologies, Aparri, Philippines, Iron Sands resource assessment, Operational staff and project support (VC-700)

January 2014
URS, Darwin NT, Pre-dredge survey / contaminated sediment (VC-450)Darwin URS Sub-sampling East Arm

March 2014
Aurecon, Darwin NT, Geotechnical Survey (VC-450)

April 2015
URS, Darwin NT, Pre-dredge survey / contaminated sediment (VC-450)

June 2014
GHD, Koolan Island, Piston / Gravity core

July 2014
Dof Subsea, NW shelf, WA Puffin Field, Piston Coring, Anchor placement survey

July 2014
Tauranga Port Authority, Tauranga, NZ Harbour, survey, pre-dredge (VC-450)

September 2014
Dof Subsea, Malampaya, Philippines, Gas Pipeline survey. Piston corer, 800 m water depth.

December 2014
FURG, Brazil Rio Grande, Brazil, SALE: SEAS VC-450 system

Comments are closed.